Do you supply products for new battery and solar sites?
Yes. We build the hardware and patented software behind Intellect Operate, our battery energy management system, and Intellect EnFORM, our solar monitoring platform. Deploy them for new installations with your own team or choose WATTMORE engineering, integration, and commissioning support.
Can you replace the EMS on an existing battery site?
Yes. We help assess existing sites, troubleshoot equipment communications, and replace controls platforms that are not meeting the project’s needs. We start with the equipment, available documentation, and operating goals to define the integration and migration scope.
Can our team set up and run the product ourselves?
Yes. Your team can set up, configure, and use Intellect Operate or Intellect EnFORM independently. WATTMORE design, integration, commissioning, and ongoing support are optional, so you can choose the help you need.
Which battery applications does Intellect Operate support?
Intellect Operate supports grid-connected storage, off-grid systems, microgrids, peak shaving, and demand reduction. Intellect PPC is our Power Plant Controller product and a control layer within the Operate battery EMS. It provides frequency response, droop control, voltage and reactive power control, ramp rate management, and utility dispatch, configured around the equipment and requirements of the project.
What is the difference between Operate and EnFORM?
Intellect Operate is our battery energy management system: it coordinates dispatch and site controls. Intellect EnFORM is our solar monitoring platform: it collects site data and gives teams visibility into production, equipment health, and performance. We help you choose the right scope for your site.
Can you work with equipment from different manufacturers?
We integrate across battery, inverter, meter, and other equipment manufacturers using interfaces such as Modbus, DNP3, and MQTT. Compatibility and the work needed to support each device are reviewed during project scoping.